Quality Control |
| We are specialized in designing , manufacturing and exporting high quality daily-used porcelain and art ceramic . |
|
|
|
|
|
| QUALITY CONTROL PROCEDURES |
|
|
To ensure the quality of final products, we specially established an independent quality inspection department. Quality control in-charge directly reports to the general manager and factory director.
Not only we inspection the final products but also carried out from the incoming raw material. |
Raw Materials inspection |
| Materials received at the factory should be subjected to a thorough physical inspection to determine. While the physical inspection is ok, we will tool a sample for final determine. Sampling is the most important activity in quality control, because no analysis can be better than the sample from which it is made. |
The inspection in producing |
| During the mass production, we will spot check from time to time. |
The inspection in producing |
| The inspection level is mutually decided between us and customer as per the requirement. Generally specking, we follow level No. 1 single sampling plan for normal inspection at AQL 1.5 to 4. |
| Quality Control Team |
|
|
| Independent quality control department of qualified and experienced staff if formed to ensure and achieve the stringent quality requirements. |
(1)Q C In charge |
(2)Q C Inspector |
| |
|
|
|
|
|